Performance Period: Sep 1, 2026 - Aug 31, 2027

Tickets closed, pace against target, and current workload for the Metro Web Team.

Ticket data update date unavailable

Show instructions and settings

Follow the steps below:

  1. The dashboard loads data/ticket_export.csv automatically when it is available.
  2. Or upload a CSV file yourself.
  3. The dates start on the current fiscal year (September 1 – August 31). Change the Start Date and End Date to look at a different range. This affects Closed Tickets and Work Analysis.
  4. Set the Annual Target for tickets per developer. It is used to measure pace.
  5. Click Update Dashboard to refresh every tab with your dates and target.
  6. All numbers are as of the date the ticket data was updated, and include only tickets assigned to Mark, Melissa, Trang, and Adrian.
  7. Use the tabs to switch between different views:
    • Closed Tickets - Tickets closed, pace against target, and monthly totals
    • Current Workload - New and closed tickets, how long tickets have been open, and the list of open tickets
    • Work Analysis - Level of Effort and Web Work Type for tickets closed in the selected dates, or for open tickets

Target number of tickets each developer should close per year.

Powered by the Metro Web Team